For the entire interior, we scraped all of the ceilings to remove the popcorn texture, repaired and retextured the walls, and repainted everything (walls, ceilings and trim).

Still on the to-do-list - replace the front door and remove the chipped floor tile, replacing it with wood that will extend into the currently-carpeted sitting room and dining room.



We'll eventually replace the countertops with a modern surface, change all of the major appliances to stainless and install a vent hood over the island cooktop.
Stairway to the second level. We obviously changed the hot colors out for a neutral. We also washed and moisturized (several times) the banister - probably for one of the first times since the home was built in 1987.

Another long-term goal is to change the banister. We're thinking we might go with wood and wrought iron.
Upstairs main hallway.
Guest bathroom - repainted. Now, unfortunately, we have to replace hardware that's fallen off the walls. (What a pain!)


We'll also frame out the mirror and install another cabinet over the toilet area to give the room a more finished appearance.
The gameroom - formerly a nursery. We did an extensive amount of wall cleaning and hardware removal before painting. Our pool table will live in this room, along with a flat screen/gaming center in the left side of the closet space. (We'll reinstall a door of some sort to protect the tv from errant pool shots!)

No comments:
Post a Comment